5-9 September 2016
Prague Congress Centre
Europe/Prague timezone

P4.008 SPIDER beam source procurement: manufacturing and assembly at the factory

8 Sep 2016, 14:20
1h 40m
Foyer 2A (2nd floor), 3A (3rd floor) (Prague Congress Centre)

Foyer 2A (2nd floor), 3A (3rd floor)

Prague Congress Centre

5. května 65, Prague, Czech Republic
Board: 8
Poster A. Experimental Fusion Devices and Supporting Facilities P4 Poster session

Speaker

Mauro Pavei (Consorzio RFX)

Description

The heating neutral beam injectors (HNBs) at ITER are expected to deliver 33 MW of neutral beam power to the ITER plasma for the purposes of heating and current drive. This is achieved by using 2 injectors, each capable of delivering 16.5 MW of neutral beam power. The beam source of each injector is a complex assembly composed by an RF based negative ion source having an extraction area of ~1.6 m2 2 and a 1MV accelerator having 5 stages of 200 kV each. As a similar source meeting the ITER beam specifications is yet to be realized and the functional requirements have never been met, it was recognized as necessary to setup a test facility, PRIMA (Padova Research on ITER Megavolt Accelerator), in Italy, including a full-size 100 kV negative ion source, SPIDER test bed, and a prototype of the ITER HNB injectors, 1 MV MITICA test bed. The SPIDER beam source procurement started in October 2012 and is expected to be delivered during the second half 2016. Some technical challenges have been overcome during the manufacturing phase and prototypes have been developed to qualify some design details and manufacturing processes for different source components. All the parts and components of the beam source are currently manufactured and tested. The next phase of assembly at the factory is expected to begin in the second quarter of 2016 and requires a well-developed sequence of operations not only to assemble the different components of the source ensuring electrical insulation, leak tightness and grids alignment within the envisaged tolerances but also of the mounting of various diagnostics, which will aid the operation and optimization of the source parameters. The paper will highlight procurement challenges, the technical achievements and the assembly experiences of this complex component.

Co-authors

Andrea Ceracchi (CECOM S.r.l., Via Tiburtina – Guidonia Montecelio - Roma, Italy) Antonio Masiello (Fusion for Energy, C/ Joseph Pla 2, 08019 Barcelona, Spain) Bernd Sczepaniak (Galvano-T GmbH, Raiffeisenstraße 8, 51570 Windeck, Germany) Christophe Lievin (Thales Electron Devices, Velizy Villacoublay, France) Diego Faso (CECOM S.r.l., Via Tiburtina – Guidonia Montecelio - Roma, Italy) Diego Marcuzzi (Consorzio RFX, 4, Corso Stati Uniti - 35127, Padova, Italy) Jacques Boury (Thales Electron Devices, Velizy Villacoublay, France) Joseph Graceffa (ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex, France) Mahendrajit Singh (ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex, France) Mauro Pavei (Consorzio RFX, 4, Corso Stati Uniti - 35127, Padova, Italy) Michael Bush (Galvano-T GmbH, Raiffeisenstraße 8, 51570 Windeck, Germany) Pierluigi Zaccaria (Consorzio RFX, 4, Corso Stati Uniti - 35127, Padova, Italy)

Presentation Materials

There are no materials yet.